Equip the new storage building.
Monday, May 22, 2023
With the equipment of the new building, the chief and the deputy of the arrangements moved into this building and began their work.
According to the area's public relations report, the previous arrangements building was assigned to the conference hall some time ago, and the arrangements' management continued its work in the temporary building. According to this report, after equipping the new building at a cost of 5 billion Rials, this building was handed over to the Directorate of Arrangements and the Head and Deputy of Arrangements started their works in this building.
Leave your comment
User Comments ( 0 Comment(s) )